Doors and Windows in Ireland, Priced by the Opening

Tell us which openings you are replacing and the frame style you prefer. See what a whole-house package costs supplied and fitted in Ireland. Then one local installer rings you with a written price.

Free, no obligation. One local installer prices it, not five.

  • €6,500 to €10,500a 3-bed semi uPVC package, fitted
  • Up to €5,600SEAI windows and external doors grant
  • 1.4 W/m²KPart L replacement U-value limit
  • 1,836,728private Irish households, Census 2022

Price my openings

Four quick taps and our Irish price range shows before any contact detail is asked for. One local installer rings you, not five.

A full-house windows and doors package, 8 to 12 openings (3-bed semi size), in uPVC: €6,500 to €10,500, supplied and fitted before any SEAI grant.

Step 1 of 5

What are you replacing or building?

Pick the closest match. The surveyor checks every opening in person.

How this package estimate is worked out

The range reflects typical supply-and-fit door and window prices in Ireland for that package type, opening count and frame material, assuming existing structural openings and standard removal of old frames. Triple glazing typically adds 10% to 15%, coloured uPVC foil adds 15% to 20%, and widening a rear wall for a wide slider or bifold requires a structural lintel priced separately. Ask for written U-values and 13.5% VAT confirmation. Use this range to budget: only an on-site survey gives a fixed price.

Three steps from rough count to sealed openings

  1. Budget your openings hereSelect the bundle, opening count and frame type to see our Irish price guide before leaving a number.
  2. One surveyor checks every revealYour outline reaches one local installer who measures each frame, checks lintels and confirms U-values in writing.
  3. Manufactured, fitted and sealedAll matching windows and doors arrive together, old units are hauled away and seals are checked before final payment.

Piecemeal swaps, or one matched house schedule

Piecemeal swaps

  • Front door grey and window frames end up two different shades
  • Separate call-out, crane and disposal charges paid on every room
  • Five glazing sales reps ringing after one enquiry form

One matched schedule

  • Our supply-and-fit range shown on screen before you share a phone number
  • Frames, glazing, cills and RAL finishes ordered off one coordinated survey
  • One local window and door installer puts the full figure in writing

Four questions before a surveyor rings

Will I be hounded with calls?
No. Your request goes to a single local installer in your county, and nowhere else. Never circulated to a directory or call centre.
Can I claim an SEAI grant for windows and doors?
Pre-2011 Irish homes may qualify for €1,500 to €4,000 on windows plus €800 per external door (up to two) via SEAI One Stop Shops or standalone grants. doorsandwindows.ie is not SEAI or a government body and does not award grants.
What does a whole-house fitted price cover?
Removal and disposal of old frames, made-to-measure new windows and doors, external cills where worn, airtight perimeter sealing and neat making-good around reveals.
How long from survey to fitting day?
White uPVC runs 3 to 5 weeks, coloured uPVC 5 to 7 weeks, aluminium 6 to 10 weeks and aluclad 8 to 12 weeks. Fitting a 3-bed semi takes 2 to 3 days.
Wide sliding patio doors opening from a bright room onto a green garden

See your house package price before anyone rings

Pick the bundle, opening count and frame material. When you want a measured quote, your outline goes to a single local installer in your county.

Whole-house prices by frame system

Supply-and-fit benchmarks across Ireland including old frame removal, before any SEAI grant.

uPVC (white / foiled)

3-bed semi full package
€5,500–€8,500 / €7,000–€10,500
4-bed detached package
€8,500–€12,500 / €10,500–€15,000
Typical whole-window Uw
1.2 to 0.8 W/m²K
Factory lead time
3–7 weeks

Aluminium

3-bed semi full package
€11,500–€16,800
4-bed detached package
€17,000–€25,500
Typical whole-window Uw
1.3 to 0.9 W/m²K
Factory lead time
6–10 weeks

Aluclad

3-bed semi full package
€13,500–€19,500
4-bed detached package
€20,000–€30,000
Typical whole-window Uw
1.0 to 0.78 W/m²K
Factory lead time
8–12 weeks

Every door add-on, self-build tier and structural extra sits on whole-house door and window costs.

How opening count shapes a package quote

Bundling windows and doors onto one factory order cuts per-opening installation overhead.

1–3 openings€1,500–€3,800Front & back doors
4–7 openings€4,600–€7,200Terrace / extension
8–12 openings€6,500–€10,5003-bed semi bundle
13+ openings€9,500–€15,0004-bed detached

Compare a 3-bed semi bundle against a 4-bed detached or bungalow schedule, or see patio and bifold add-ons.

Four Irish regulations every package must satisfy

Thermal limits, fire escape openings, airflow and grant rules all interact on fitting day.

Independent guide: doorsandwindows.ie is not SEAI or a government body and does not award grants.

  1. Part L thermal cap (1.4 W/m²K). Replacement windows and external doors must meet a whole-unit U-value of 1.4 W/m²K or lower, while new builds commonly target 0.8 to 1.1 W/m²K.
  2. Part B fire-escape egress. Upstairs bedrooms require an unobstructed clear opening of at least 0.33 m², minimum 450 mm width and height, with the sill 800 mm to 1100 mm above the floor.
  3. Part F background vents. Swapping draughty old frames for airtight units requires properly sized trickle vents per habitable room unless whole-house mechanical ventilation is installed.
  4. SEAI pre-2011 grant approval. Windows (€1,500 to €4,000) and doors (€800 each, max two) are funded via SEAI One Stop Shops, standalone grants or Warmer Homes, and approval must issue before work begins.

Read SEAI window and door grants, Part L glazing limits and Part B egress and Part F vents.

Installers covering all 26 Irish counties

Choose your county inside the planner so a local surveyor measures your home.

Whole-house glazing requires at least two visits: a detailed opening survey and multi-day fitting with waste frame disposal. Matching your county keeps travel surcharges off the invoice and ensures coastal wind exposure or Dublin terraced access is accounted for properly. See counties covered and how openings are surveyed.

Five lines every written package schedule needs

Verify these specs before paying a manufacturing deposit.

  • Line-by-line opening schedule. Every window and door numbered by room with width, height, hinge side and fixed vs opening sashes.
  • Whole-unit U-value (Uw / Ud) in writing. Confirm 1.4 W/m²K or lower across the complete frame and glass, not glass-only Ug.
  • Frame profile and colour finish. State smooth white vs foiled uPVC, polyamide thermal break on aluminium, or timber species on aluclad, plus exact RAL codes.
  • Glazing makeup and spacer bars. Double or triple pane thickness, low-E coating, argon cavity, warm-edge spacers and toughened safety glass in low-level panes.
  • Part B fire-escape hinges. Confirm egress hinges meeting 0.33 m² clear opening on every upstairs bedroom window.

The complete ten-point check sits on whole-house package costs.

Common questions before you order

How much does a full house of windows and doors cost in Ireland?

A typical 3-bed semi (8 to 10 windows plus front and rear doors) runs €5,500 to €8,500 in smooth white uPVC, €7,000 to €10,500 in coloured uPVC, €11,500 to €16,800 in aluminium and €13,500 to €19,500 in aluclad before grants. Full cost guide.

How much is the SEAI grant for windows and external doors?

SEAI awards €1,500 for an apartment, €1,800 for a mid-terrace, €3,000 for a semi-detached or end-of-terrace house and €4,000 for a detached house, plus €800 per external door up to two doors. doorsandwindows.ie is not SEAI or a government body and does not award grants. Grant breakdown.

Is it cheaper to replace windows and doors together?

Yes. Ordering all windows and doors together cuts duplicate delivery, survey, scaffold and skip fees, keeps exterior RAL shades uniform and locks in one warranty and VAT invoice.

Do replacement windows in Ireland need triple glazing?

Not always. High-grade double glazing meets the 1.4 W/m²K Part L backstop, though triple glazing (0.8 to 1.1 W/m²K) typically adds only €800 to €2,000 on a 3-bed semi and cuts cold downdraughts on north-facing elevations. Double vs triple glazing.

What VAT rate applies to supplied and fitted windows and doors?

Supply-and-fit contracts qualify for 13.5% VAT when material costs remain at or below two-thirds of the net total under Revenue rules. Supply-only orders carry 23% VAT. VAT two-thirds rule.

Do I need trickle vents in replacement windows?

Usually yes under Part F unless your house runs whole-home mechanical ventilation with heat recovery (MVHR). Removing draughts without planned airflow drives winter condensation.

How many days does replacing a whole house take?

Front and back doors take 1 day, a 3-bed semi takes 2 to 3 days and a 4-bed detached house takes 3 to 5 days once the factory frames arrive on site.

Who rings me after I use the opening planner?

Your outline is passed to a single local installer in your county, and nobody else. They arrange a physical survey and issue a written quote.

All doors and windows guides